It has been 6 months sense our last house to-do list, so I think it’s time for another list to see exactly were we are with our house projects. Things on the list may change over time but for now its our list of things to do.
Let’s start with that list:
– The Front/Side Yard (63% Complete) –
To Do:
Trim Trees (working on this)Remove old bushesRe-stain and waterproof shutter- Remove the pine tree that is decaying (we have change our mind again and plan on replacing the tree)
Aerate,re-seedandpower rake the yardMake flower beds look wonderful by adding mulch and more plantsInstall a Drip System- Repair old cracked concrete stairs
gapsandfixing the chipped concrete - Plant a new tree were pine tree was
Mulch around current treesRe-paint light poleand re-brick surrounding pole- Redo Mailbox
- Fix Sprinklers
– The Porch (40% Complete) –
To Do:
- Redo the porch rails & roof
Paint the front door- Add new house numbers
Add new screen door- Add a planter box
– The Garage (40% Complete) –
To Do:
Add a threshold (to stop water from coming into the garage)- Add weather-stripping to garage door
Repaint door into garage and caulk around- Add gutter to north side of garage
- Add new siding
– The Back Yard (56% Complete) –
Remove the old shedRemove laundry polesClean the whole yard (remove old sandbox, bricks, dog house,etc..)- Fix fence and paint it
- Build patio
Remove old screen doorPaint door and trimAdd new porch light- Build
garden boxes andsandbox Plant seedAdd plants next to house- Add plants next to garage
- Build an overhang over the back door
Redo the cracked porchBury gutters downspout- Redo gutters along house (After adding overhang)
- Build a new shed on north side of garage
- Build a little storage shed on south side of garage
- Build/add outdoor furniture
– The Living Room (78% Complete) –
To Do:
Paint the walls, ceiling and trimUpdate vents and light coversAdd new windowsandframe in the windows (jambs, trim, & painting)Update door knobsand hinges- Paint and add shelving to closet
Add stump tablesFix computer desk by making shelves look built-inBuild a media consoleAdd some picture framesMake a slipcover for the couchAdd new chairshere & here- Add crown molding (Phase 2)
- Re-stain doors (Phase 2)
– The Kitchen (57% Complete) –
To Do:
- Build cabinet above stove and add microwave (will give us more counter space)
Add new windowsandframe in the windowsDIY kitchen table and chairsPaint the walls, ceiling and trim- Update the old kitchen lights
Remove door to the stairsand fix trimAdd dishwasher- Paint the cabinets (IN PROGRESS)
- Add new hardware (IN PROGRESS)
Add backsplashReplace old blinds with new ones- Replace sink and
plumbing Add new faucet- New counter tops and floors (Phase 2)
- Remove wall to living room (Phase 2)
New fringeand stove
– The Bathroom (62% Complete) –
To Do:
Remove wallpaperRepaint trimRemove paint from old cabinet hingesUpdate door knob& hingesPaint walls and ceilingPaint old mirrorbut one day add new mirror (Phase 2)Re-caulk everything- Upgrade lighting above sink and
ceiling - Add new ceiling fan
Re-grout tileand one day replace (Phase 2: Tiles are cracked and move when you walk on them.)- Replace toilet (Phase 2)
Add hooks and remove towel bar
-Upstairs Hallway (67% Complete) –
To Do:
Paint wallsand ceilingRepaint all of the trim and cabinet doorsRemove paint from hinges and add new hardware- Update light
Add artwork
– The Master Bedroom (66% Complete) –
To Do:
Paint walls, ceiling andtrim- Makeover closet
Add new windowsandframe in the windowsAdd blinds to windowsAdd headboard to bedMake a new quilt for bedAdd artwork,mirror, and maybe curtainsUpdate door knobsand door hardware- Re-stain doors (Phase 2)
- Add crown molding (Phase 2)
– Kid’s Room (55% Complete) –
To Do:
Paint walls, ceiling and trimAdd new windowsandframe in the windowsAdd blindsand maybe some curtains- Redo closet
- Re-stain doors
Update door knobsand hardware- Add crown molding
- Add artwork/picture frames
– The Stairs (50% Complete) –
To Do:
Remove the old carpet from the wood stairsRe-finish stairs- Paint the walls and ceiling
- Paint trim and
access door Paint backdoorAdd coat hooks- New light fixture
- Redo wall (previous owners added but needs to be fixed)
- Build shelving above stairs ???
– Basement Play/Living Room (6% Complete) –
To Do: The plans in this room have changed
- Add new windows
Remove all old framing- Move laundry to corner
- Put cabinets above washer and dryer
- Insulate room, maybe
- Create a closet under stairs
- Move water softener
- Install flooring or paint cement
- Remove wall paneling
- Install drywall
- Update sink
- Paint walls, ceiling, and trim
- Add barn door
- Add a ceiling light fixture
– Basement Bedroom (23% Complete) –
To Do: Complete remodel
- Make window to code and add new window
Paint cinder block- Insulate room
- Add a closet
Remove old carpetingand install new (need to blog about)Remove wall paneling and ceiling paneling(need to blog about)- Install drywall
- Add trim and crown molding
- Paint walls, ceiling, and trim
- Paint door and update hardware
- Add blinds or curtains
- Add a ceiling light fixture
– The Basement Craft Room (6% Complete) –
To Do: Complete remodel
- Make window to code and add new window
- Insulate room
- Paint cinder block
Remove brick box behind door- Remove old carpeting and install new
- Remove wall paneling and ceiling paneling
- Install drywall
- Add trim and crown molding
- Paint walls, ceiling, and trim
- Paint door and update hardware
- Add blinds or curtains
- Add a ceiling light fixture
– The Closet below Front Porch (42% Complete) –
To Do: Complete remodel (we changed our mind after lots of research and decided the best thing was to make this an insulated closet)
Paint cinder blockAdd insulationInstall drywall- Paint closet
- Add shelving
- Update light fixture
- Add flooring
– The Basement Bathroom (11% Complete) –
To Do: Complete remodel
- Add new window (working on this, just waiting on the window to get in!!)
New water heaterand move water heater into storage roomDemo Room(need to blog about this)- Replace shower
- Install new flooring
- Replace toilet
- Replace vanity
- Install drywall
- Add trim
- Paint walls, ceiling, and trim
- Paint door and update hardware
- Add a ceiling and vanity light fixture
– The Storage Room (9% Complete) –
To Do:
- Replace furnace
Remove work bench- Add new window
- Paint cinder block
- Insulate room ???
- Paint floor
- Install drywall
- Add trim
- Paint walls, ceiling, and trim
- Add door
- Add a ceiling light fixture
– General Whole House Ideas (20% Complete) –
To Do:
- Replace all windows (only the basement windows are left)
- Redo all electrical
- Redo all plumbing (
underground is finished) - Replace all light switch plates and outlets in the house
- Replace roof
What a list… I can not believe all that we have done but we still have a list to do. Sometimes I wonder what we got ourselves into and if we will ever have the money to finish all this… But with time it will all get done. How is your to-do list going?